It was another hot one today. One has to be careful not to work too hard.
The first thing to do was to take a hike through the Great Southwest Desert and check on the 321. The clamps I've installed already seem to be holding up well, so that's good news. The tarp seems to have stopped shifting. I cut off another excess acre or so of tarp and attached some more of the clamps provided by Joel. Thanks again!
The first thing to do was to take a hike through the Great Southwest Desert and check on the 321. The clamps I've installed already seem to be holding up well, so that's good news. The tarp seems to have stopped shifting. I cut off another excess acre or so of tarp and attached some more of the clamps provided by Joel. Thanks again!

Joel also made up three new trolley ropes for me, and I replaced the one on the 309, as mentioned earlier. I think I'll wait until the rope guards are installed to put new ropes on the 319; I may be able to start on that this Saturday.

Then the brake rigging. I was able to reposition both top rods so there is less piston travel. Standing travel in service is now 6", which is still a little more than desired, but a noticeable improvement.



And it looks like Barn 9 now has a vistadome section!
{ 0 comments... Views All / Send Comment! }
Post a Comment